- Complete construction of the new silo with capacity of 22,000 tons of sunflower or 40,000 tons of grain.
- The work began on the most modern drying with capacity of 900 t / day.
- Metal warehouse was built on 2000 m2 at the former location ‘Bima’.
- Five PC were Bought, as a basis for separation from the Computer Center conglomerates.